PROFESSIONAL
SUMMARY
Hands-on experience as a Primavera Master
Scheduler, tracking, reporting, budgeting and scheduling. Extensive
project management, planning, and developments and change control and project
supervisory experience. 13 years of HR for Residential Construction
Company. W2’s, 940, 941, and recruiting of employees in all aspects of
the construction industry. Production planning in a high volume Manufacturing
and Automobile Setting
TECHNICAL SUMMARY
Primavera P3 (10 years) Proficient on P5.0
and P6.0 and P7.0, ISO Procedures, Word, PowerPoint, Access, Excel, Oracle,
sharepoint,Visio, Project Net, Suretrak, and Webster, Great Plains Purchasing
System, AS400 Purchasing Program, Synergen, and SAP. Super User for P6 and P7
training of others.
Working with Engineering and Drafting
pulling drawings for the Project Managers both with Sevenson engineering on a
dredging project and with General Electric.
PROFESSIONAL CONTRACT EXPERIENCE
Matthews Group Inc /High Point, NC
February 2014-May 2014
Production Planner/Production Supervisor
·
Planning and
scheduling of all various types of school busses all over the United States
·
Overseeing
production of materials and planning of work being done in and out of school
busses
·
Installation
of air conditioners, hand rails, modesty panels, compressors, mounts,
handicap panels,etc
·
Running work
orders, percentages of completes, cost, inventory, and assembly
·
Supervising
and directing 10 production employees
·
Using excel
spread sheets, Microsoft software
·
Purchasing in
Great Plains
·
Logistics of
Thomas Buses
Seminole Electric/Randstad Engineering
Bowling Green, Florida
November 2012-April 2013 (consultant
Planner-Procurement-Inventory-Receiving-Logistics
· Responsible for inventory, receiving, stock code changes,
catalog additions, and quantity changes.
· Oversaw purchasing, requisitions.
· Reviewed, analyzed, planned and scheduled work orders to
be performed by maintenance, operations, and contractors, including availability
of spare parts. Developed routine preventive maintenance job plans.
Developed, planned, scheduled, and monitored annual outage maintenance
tasks. Maintained records for issuing, tracking and history of
preventive maintenance. Ensured periodic maintenance intervals are correct
and accurate test dates are entered within the Synergy maintenance program.
· Worked with Fed-EX, UPS and major trucking firms to ship
and receive.
White Construction Brookesville, Florida
August 2012-October 2012 (Consultant)
Lead Master Scheduler
· Worked on a complete reconstruction of an old Biomass
Cycle Plant in Tampa, Florida that was once running and reconstructed.
· Maintained and updated 10,000 activities for the civil,
mechanical, construction and supervision of this large Biomass Cycle
Plant.
· Conducted weekly and monthly meetings and updates to keep
everyone current on the progress and work that was being performed on time,
and the activities that were waiting on materials or inspections.
· Performed walk downs of this large cycle plant and keeping
in touch with supervisors and manager.
· Responsible for accounting, cost coding and resource
loading.
· Supervised and Led 6 schedulers.
TIC Construction
February 2012 - March 2012 (Consultant)
Field Engineer II/Primavera Scheduler
· Worked on a combined cycle plant in Goldsboro, North
Carolina. This was a new built cycle plant for Progress Energy.
· Maintained and updated 10,000 activities for the civil,
mechanical, construction and supervision of this large
Combined Cycle Plant.
· Conducted weekly and monthly meetings and updates to keep
all parties involved current on the progress and work that was being
completed on time, and the activities that were waiting on materials or
inspections.
· Walk downs of this large cycle plant and keeping in touch
with the supervisors and the manager.
BHI Energy/Progress Energy Raleigh, North
Carolina
September 2011 – February 2012 (Consultant)
Ace Long Term Planner/Master Scheduler
Primavera
· Long Term Planner/Scheduler Manager for the Nuclear
Division and Outage Management.
· Performed modifications, in-processing, and outage scheduling.
· Maintained job cost, resource loading, and schedule in a
timely manner.
· Used P7 for two different job locations primavera software
issues, updates, EVM, baselines, WBS, resource loading, cost accounting, and
critical paths.
· In charge of planning and scheduling for the in-processing
for the PEM group and the Fleet Division.
.
Babcock & Wilcox Charlotte, North
Carolina
March
2011 - September 2011 (Consultant)
Project Control Engineer
· Master Scheduler for the Nuclear Division and Outage
Management.
· Managed job cost, resource loading, and schedule in a
timely manner.
· Used P7 for two different job locations primavera software
issues, updates, EVM, baselines, WBS, resource loading.
· Security clearances and work pertained to Sharon-Harris.
· Responsible for accounting cost coding and resource
loading.
· DOE experience
MNES, Fort Mill, South Carolina
Dominion Power
August 2010 - March 2011 (Consultant)
Project Control Engineer
· Master Scheduler working for MNES in collaboration with
URS, AEA and Dominion Power on the construction of a new Power Plant.
· Nuclear modifications and outages.
· Worked in P6 Project Management.
· Responsible for accounting, cost coding and resource
loading.
· DOE Experience
Duke Energy, Charlotte, North
Carolina
August 2009 – Feb 2010 (Consultant)
Master Scheduler/Primavera
Scheduler
· Master Scheduler for the Nuclear Division and Outage
Management.
· Nuclear modifications and outages
· Maintained job cost, resource loading, and schedule in a
timely manner.
· Used P6 for two different job locations.
· Super user for all of Duke in primavera software issues,
updates, EVM, baselines, WBS, resource loading, cost accounting, and critical
paths.
· Worked on all the Duke Sites.
· Responsible for accounting, cost coding and resource
loading.
· IT Implementation, conforming, building and supervised
others.
· DOE Experience
Trans-Nuclear, Columbia,
Maryland
August 2008 – Feb 2009 (Consultant)
Master
Scheduler/Project Management
· Master Scheduler in P6 and P3 keeping track of all
deliveries and builds for sites.
· Nuclear modifications and outages
· Implementation of schedule for 6 project managers.
· Deliveries of fabrication and assembly of units for spent
waste on all projects.
· Working with 6 project managers on civil and commercial
construction for all projects.
· Primavera software issues, updates, EVM, baselines, WBA,
resource loading, cost accounting, and critical paths.
· Responsible for accounting, cost coding and resource
loading.
Florida Power and Light, Juno Beach,
Florida
2006 – 2008 (Consultant)
Master
Scheduler
· Master Scheduler in P3, P5 and P6 keeping track of all
outages for Saint Lucie, Turkey Point, and Seabrook.
· Worked on multimillion dollar power outages on nuclear.
· Resource loading, level of effort, and implementation.
· Lead for 6 project managers, civil, mechanical, and electrical.
· Nuclear Modifications and Outages
· A badge employee for Absolute Consulting.
· Primavera software issues, updates, EVM, baselines, WBA,
resource loading, cost accounting, and critical paths.
· Responsible for accounting, cost coding and resource loading.
· In charge of 7 schedulers on 7 different sites, Master
Scheduler.
·
Sevenson Environmental Services, Niagara
Falls, NY
2005 – 2006 (consultant)
Master
Scheduler/Project Control
· Responsible for procurement and materials management,
change orders and submittals.
· Developed, changed and responded to RFQ's and RFI's.
· Worked with Insurance and Bonds for Insurance Liabilities.
· Master Scheduler in P3 and P5.
· Worked on a $500M dollar project in Fort Edward, New York.
· Management of Civil Construction with DA Collins.
· Responsible for Primavera software issues, updates, EVM,
baselines, WBA, resource loading, cost accounting, and critical paths.
General Electric, Schenectady,
NY
2002 -
2005 (Consultant)
Planner/Scheduler
P3
· Purchased all outage materials, payroll, time sheets,
contracts, percentages complete, and schedule in both Suretrak and baseline.
· Informed management of the percentage completed, all
purchasing and contracts.
· Master Scheduler in Primavera 3.
· Responsible for Baseline Software.
· Reported to the site manager and project manager all
aspects of schedule vs. goal, both financially and accomplishment issues.
· Worked with commercial companies, documenting man hours,
and transmittals of bid packages, and invoices for the commercial builders.
· Managed all accounts, and responsible for the daily
performance of scheduled meetings.
· Maintained and coordinated all Material Management Reports
Tracking and Material Reporting Forms Tracking.
· Primavera software issues, updates, EVM, baselines, WBA,
resource loading, cost accounting, and critical paths regarding nuclear
modifications and outages.
· Managed relationships with Fed-EX, UPS and major trucking
firms to ship and receive